Quality Gray GA septic system installers do a number of legwork, long before a unit gets placed into the ground. A new unit will last years, and possibly even generations, if it’s placed properly, but it can fall short instantly if it’s not. Additionally, all Gray GA septic system installers must acquire a permit for them to perform the install, and may need to coordinate with city or county officials to show that specific tests were run in order to move on. These three evaluations are vital initial steps that should always be taken before any work or designs are done, and it may also be beneficial to do them before you buy a property, so you could be assured that a tank and leach field will be permitted.
1. Pit
The pit test is quite straightforward. In the course of this test, a hole is excavated and the soil is inspected to establish its composition. A typical leach field is reliant on the soil’s structure to drain efficiently. If there is a bunch of gravel or sand, your leach field should be able to discharge the effluent (water) from the tank well, where the soil will finish cleaning it. If the soil has a considerable amount of clay or rock, it won’t sink well, and so a conventional leach field will not be an alternative. If the location you’ve selected does not pass the pit test, you may be able to select another site on your house or use an alternate kind of drain field, such as a mound system.
2. Perc
The perc, or percolation test, involves excavating a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then filling it with water. The hole is commonly left saturated for about two hours, and refilled as needed. Then, the hole is filled with 6 inches of water and observed for water drainage.
3. Visual
There are many things an inspector will look into visually. A lot of units are gravity-fed, so they don’t rely upon electricity or pumps to transfer effluent from the tank to the leach field. Because of this, the slope of the ground is essential. An inspector will also search for slopes that could feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.
Work with Quality Gray GA Septic System Installers Today
Picking the right configuration, kind of system, and evaluating the land properly, are all integral procedures in making sure an install goes off without a hitch. Most importantly, these steps ensure that the install is done correctly, so that a system provides years of use without issue. If you’re preparing for an install, call Septic Tank Pros Macon GA. Our partner professionals are skilled and committed to quality, so you could be sure the job is done right. Call (478) 202-7130 today.
The post 3 Assessments Quality Gray GA Septic System Installers Do Before Designing appeared first on Septic Tank Pros Macon GA.
from Septic Tank Pros Macon GA http://septictankmaconga.com/gray-ga-septic-system-installers/
via IFTTT
No comments:
Post a Comment