Quality Payne GA septic system installers do a lot of legwork, long before a unit gets installed into the ground. A brand new unit will last many years, and possibly even generations, if it’s set up properly, but it can break down immediately if it’s not. Additionally, all Payne GA septic system installers must obtain a permit in order to execute the install, and may ought to partner with city or county officials to show that specific tests were done in order to progress. These three tests are necessary first steps that should always be taken before any job or designs are done, and it may also be helpful to do them before you acquire a property, so you can be assured that a tank and leach field will be allowed.

1. Pit

The pit test is quite uncomplicated. In the course of this test, a hole is dug and the soil is inspected to establish its structure. A conventional leach field is dependent on the soil’s composition to drain effectively. If there is a lot of gravel or sand, your leach field should be ready to discharge the effluent (water) from the tank well, where the soil will finish sanitizing it. If the soil has a lot of clay or rock, it won’t drain well, therefore a traditional leach field will not be an alternative. If the site you’ve selected does not successfully pass the pit test, you may be able to select another site on your property or use an alternate type of drain field, like a mound system.

2. Perc

The perc, or percolation test, calls for digging a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then filling it with water. The hole is generally left drenched for about two hours, and topped off as needed. Then, the hole is filled with 6 inches of water and monitored for drainage.

3. Visual

There are many things an inspector will check visually. The majority of units are gravity-fed, so they don’t rely on electricity or pumps to transfer effluent from the tank to the leach field. Because of this, the incline of the ground is very important. An inspector will also search for slopes that could possibly feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.

Choose Quality Payne GA Septic System Installers Now

Picking the right configuration, type of system, and assessing the land effectively, are all integral procedures in making sure an install goes off without a hitch. Most significantly, these steps ensure that the install is done correctly, so that a system provides decades of use without issue. If you’re prepping for an install, contact Septic Tank Pros Macon GA. Our partner professionals are knowledgeable and dedicated to quality, so you could be sure the job is done right. Call (478) 202-7130 now.

The post 3 Assessments Quality Payne GA Septic System Installers Run Before Designing appeared first on Septic Tank Pros Macon GA.