Quality Perry GA septic system installers do a great deal of examination, long before a unit gets put into the ground. A new unit will last years, and possibly even generations, if it’s set up correctly, but it can fall short immediately if it’s not. Furthermore, all Perry GA septic system installers must acquire a permit in order to carry out the install, and may have to partner with city or county officials to show that certain tests were run in order to continue. These three tests are necessary initial steps that should always be taken before any work or designs are done, and it may also be beneficial to do them before you acquire a property, so you could be assured that a tank and leach field will be allowed.

1. Pit

The pit test is quite direct. During this test, a hole is excavated and the soil is examined to establish its composition. A standard leach field is reliant on the soil’s structure to drain effectively. If there is a considerable amount of gravel or sand, your leach field should be capable to discharge the effluent (water) from the tank well, where the soil will finish sanitizing it. If the soil has a lot of clay or rock, it won’t sink well, consequently a traditional leach field will not be an option. If the location you’ve picked does not successfully pass the pit test, you may be able to select another site on your house or use an alternate kind of drain field, such as a mound system.

2. Perc

The perc, or percolation test, involves excavating a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then filling it with water. The hole is commonly left soaked for about two hours, and refilled as needed. Then, the hole is filled with 6 inches of water and observed for water drainage.

3. Visual

There are a variety of things an inspector will investigate visually. Most units are gravity-fed, so they don’t rely on electricity or pumps to move effluent from the tank to the leach field. Because of this, the slope of the ground is crucial. An inspector will also try to find slopes that could possibly feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.

Enlist the Services of Quality Perry GA Septic System Installers Today

Picking the right configuration, style of system, and assessing the land effectively, are all important steps in making sure an install goes off without a hitch. Most importantly, these steps guarantee that the install is done correctly, so that a system provides decades of use without problems. If you’re prepping for an install, contact Septic Tank Pros Macon GA. Our partner specialists are skilled and devoted to quality, so you can be sure the job is done right. Call (478) 202-7130 today.

The post 3 Tests Quality Perry GA Septic System Installers Do Before Designing appeared first on Septic Tank Pros Macon GA.



from Septic Tank Pros Macon GA http://septictankmaconga.com/perry-ga-septic-system-installers/
via IFTTT

No comments:

Post a Comment